Move-in dates don't slide, so your cabinet supplier can't either. The suppliers that make those dates give you a firm ship date, include everything you need to complete installation, and turn orders around in about a week.

Anything slower pushes the install into move-in week. Here is how to tell the difference before you place the order.

How fast can you get cabinet doors?

Custom door lead times vary a lot by supplier and finish. Get the number in business days. Then add shipping.

That math matters. A three-week quote plus a week in transit is a month. If move-in is three weeks out, you are already late.

So speed has two parts. How fast the supplier builds and ships, and how many other orders you still have to wait on.

Is the lead time the ship date or the delivery date?

Ask this first. A quote may count the days until the order ships. Delivery to your property comes after that.

Also ask what the quote covers. A lead time may cover the door only. Hinge boring, painting, drawer fronts, and hardware can each add time or come from a different vendor.

Get the answer in writing, as a date, before you schedule your crew.

What should you ask a supplier before a deadline order?

  • Is the quote a ship date or an arrival date?
  • Does the lead time include the finish, drawer fronts, and hardware?
  • Will parts arrive packed and labeled by unit?
  • How fast can they replace a damaged or mis-sized piece?
  • Can you reorder the exact same style and color next time?
  • Is there a minimum order?

For the full list, run your shortlist through a supplier vetting checklist.

Multifamily move-ins and student housing installs run on different clocks

In multifamily, vacancies come up all year. Each home has its own move-in date. You need a supplier that ships small, repeat orders fast and matches the last order exactly.

That is where one standard spec pays off. Same door, same color, same order every time.

Student housing is the opposite. Most units turn over at the same time. And cabinets are not a turn-week job. Turn week is cleaning, paint, carpet, and keys.

So plan the cabinet work in spring. Install it over the summer, ahead of the turn crunch and fall move-in. Order early enough that kits land when your install window opens. This guide shows how to work backward from move-in day.

Why do complete kits beat door-only orders on speed?

A door-only supplier can ship fast and still leave you waiting. Hinges come from one place, pulls from another, paint for the boxes from a third. Your install date is set by whichever box shows up last.

A complete kit removes that wait. Everything for one home ships together, presorted by unit, so your crew grabs a box and starts.

Prefinished doors cut more time. No painting doors on site, and no cure time before you hang them.

Where Qwikkit fits

Qwikkit makes complete cabinet refacing kits for property management companies and rental operators. Both lines, DuraBuild™ and DuraFuse™, ship in 5 to 8 business days from order. Transit to your property is extra, so plan for it.

Each kit is presorted by unit. Doors, drawer fronts, hinges, pulls, paint for your existing boxes, screws, and QR-coded video instructions ship together. Everything you need to complete installation is included in the kit. There is no minimum order, so you can order one home at a time as vacancies come up.

Most kitchens install in 1 to 2 days. Qwikkit has renovated more than 150,000 homes since 2017.

Qwikkit does not measure or install. It makes and ships the kits. If you need an installer, Qwikkit can point you to distributors and contractors in your area.

Planning a summer install or a string of move-ins?

Talk to the Qwikkit team about lead times and a spec you can reorder every turn.

Frequently asked questions

What suppliers can ship cabinet doors quickly enough for move-in deadlines and summer turns?

Look for suppliers that ship complete, presorted kits on a firm schedule. Qwikkit ships complete refacing kits in 5 to 8 business days from order, and everything you need to complete installation is included in the kit, so crews can start as soon as it arrives.

Which cabinet door suppliers are best for student housing operators with summer-turn deadlines?

The best fit ships complete kits fast and matches your spec on every order. Plan the cabinet work in spring and install it over the summer, ahead of the turn crunch. Qwikkit kits ship in 5 to 8 business days and arrive presorted by unit.

How long does it take to get replacement cabinet doors?

Custom door lead times vary by supplier and finish. Qwikkit kits ship in 5 to 8 business days from order. Add transit time for your location.

Is a cabinet door lead time the ship date or the delivery date?

It depends on the supplier, so ask. Qwikkit's 5 to 8 business days is the time to ship. Delivery depends on where your property is.

Can you reface cabinets during student housing turn week?

It is rarely a good idea. Turn week is packed with cleaning, paint, carpet, and key work. Plan cabinet refacing for the summer instead, so it is done before the turn.